Niclin Group Apartments – Nundah

 In Projects, Residential Construction, Scaffold

Commercial Project Services are centred around offering the highest standard in a range of scaffolding solutions. Whether you require scaffold design, material supply or on boarded labourers, CPS can deliver all of this in a time and cost-effective manner to ensure complete client satisfaction. In detail, our primary services include:

Scaffold Design

At CPS, we’re highly proficient in designing multifaceted scaffold builds using the ISCAFF design suite and 3D modelling, material take off and design substantiation by RPEQ engineers. Moreover, our experienced team has the capacity to minimise the number of unpriced hourly rate variations, giving you peace of mind throughout the span of the project.

Material Supply

CPS have extensive material supply channels and an approach to inland logistics that is at the forefront of the industry. With our unique approach to scaffold supply, CPS offers a ‘best for project’ material distribution solution. Supporting this, the CPS team also have access to all the primary prefabricated scaffolding systems. Combining these things together means that we can ensure delivery on time, every time – allowing you to be confident that you’ll meet all deadlines.

Labour (Erect & Dismantle)

Through CPS, obtaining labour solutions is a breeze. With our efficient approach to management solutions, any additional labour requirements you may have can be easily met through our database of skilled and knowledgeable tradesmen.  As we have more than 200 job-ready scaffolders spanning the east coast, CPS labour solutions is a cost-effective way to ensure your project is complete within schedule and to a consistently high standard.

To demonstrate these services, CPS were recently contracted by Niclin Group to assist with a residential apartment block in Dwyer St, Nundah on the north side of Brisbane.

Niclin Group required assistance with the erection and dismantlement of 120-tonne of scaffolding over a 20-week program. The project required internal and perimeter scaffolding for the 5-floor residential block, which the Commercial Project Services team successfully worked on for a total of 1,200 hours incident and injury free.

For more information on CPS’ scaffolding solutions, contact us today on (07) 5519 4919 or info@commercialprojectservices.com.au.

 

Recent Posts

Leave a Comment

0

Start typing and press Enter to search

Top